Patio Door Frame Prep
Overview:
The process for prepping patio frames.
Definitions:
Procedure:
- Read the barcode label looking for the windows configuration and any listed options.
- Place the frame on the table with the outside of the unit facing up.
- If color cap: Paint the corners of the frame.
-
Pull the windows mullion(s), track, T-bars, and filler bars from the pigeonhole cart.
- See the label for what slot to pull from.
-
Insert rebar into the mullion(s) and T-bar(s).
- T-bars get 2 different pieces of rebar.
- Screw a 6 X ¾” Tek screw 6” from the bottom of the mullion to keep the rebar from rattling around.
- For three and four panel doors: measure the filler bars to make sure they are correct length.
-
For three and four panel doors: Insert the filler bars into the frame.
- With a mallet tap the filler bars so they are flush.
- For three and four panel doors: Use the mullion punch jig and or the t-bar punch jig to drill 1/8” holes.
- For three and four panel doors: Remove the filler bars from the frame.
- Install the screen track into the frame.
-
Slide the metal sleeve over the door track.
- Cut the sleeve to size.
-
Install the door track.
- Install the track with the groove towards the inside of the door.
- For color cap: install the threshold.
-
Screw in the mullion(s).
- Coat the ends of the screws in silicone.
- Screw a 6 X 2” dry wall screw in the top hole.
- Screw a 8 X 3” dry wall screw in the bottom hole.
-
Screw in the T-bar(s) if needed.
- Coat the ends of the screws in silicone.
- Use three 6 X 2” dry wall screws to secure the T-bar.
- Insert the small rebar inserts into each end of the filler bars.
- Insert the filler bars.
- Screw in the wood support on sill.
- Install two anti-lift blocks over each vent portion of the door.
- Install the bumper(s) in the top DL corners of the door.
- For OXXO: Snap the center stop in the middle of the door.
- Place the AAMA and ID label on the frame.
- Tape the frame with 3/8” glazing tape.
-
Block the frame with ¾” white blocks.
- Place 2 blocks on the bottom.
- Stager 2 blocks on the right side of the frame. One in the middle one on the top.
- Stager 2 blocks on the left side of the frame. One in the middle one on the bottom.
- Shrink wrap the handle to the frame.
- Off load the frame into the staging area and pair it up with its sash.