Overfill Machine Start Up

Overfill Machine Start Up
Overview:
How to perform the overfill machines pre-shift inspections.

Definitions:
 
Procedure:


  1. Turn on the overfill machine.
  2. Inspect the machine’s lines and cords for any rips or tears.
  3. Ensure the gas is switched to argon.
  4. Check all four argon lines for proper calibration. The correct range is 1.6 – 1.8.
  5. Turn on the hotplate.
  6. Check supplies (mallet, punch tool, mylar tape, plugs, etc.)
  7. Verify you have the correct overfill stickers for the shift.
  8. Complete the inspection log.
  9. Notify the team lead of any issues.