Final Rack Report
Process:
How to use the final rack report to reduce the amount of walking required when catching.
Definitions:
Procedure:
-
Prior to the start of running a new cutout, the team lead or supervisor will update the catching board at the end of the line.
- Update the board with what batches will be finalized, and the number of racks needed for each batch.
- As a batch progresses down the line, the catchers will place the two to three most utilized racks for that batch closest to the line.