AMSCO Windows

Final Rack Report

Final Rack Report
Process:
            How to use the final rack report to reduce the amount of walking required when catching.
 
Definitions:
 
Procedure:
  1. Prior to the start of running a new cutout, the team lead or supervisor will update the catching board at the end of the line.
    1. Update the board with what batches will be finalized, and the number of racks needed for each batch.
  2. As a batch progresses down the line, the catchers will place the two to three most utilized racks for that batch closest to the line.