AMSCO Windows

Studio PW Prep

Studio PW Prep
Overview:
The process for prepping studio PW frames.
Definitions:
Procedure:
  1. While the picture window is in the rack, read the following elements of the barcode out load.
    1. AAMA rating, window color, sequence number, if WS.
  2. If the window is NC or WS, call this out to the line.
  3. Pull the window to the line.
  4. Place the correct ID label onto the frame.
    1. The ID label should go on the upper right corner of the frame. On the inside of the home.
  5. Place the gold label next to the ID label.
    1. NC (noncertified) windows don’t get gold labels.
  6. Place the window onto the belt.
  7. Put the weep hole covers in the frame.
    1. Verify the weeps are located on the sill of the frame.
  8. Tape the window with regular 3/8” glazing tape.
  9. If the window calls for WS, attach wood along the bottom of the window.
    1. Attach the wood with 8A ¾” wood screws.
  10. Block the window with 1/8” black blocks.
    1. Place one block on the head and one on each jam.
  11. On the sill, block the window with 7/8” white blocks.
  12. Off load the window onto a roller rack.
  13. Do not over stack racks.
    1. Over stacked racks will fall when Final is attempting to pull windows.
  14. Make sure all labels are facing the correct way and frames are placed in the correct sequential order.
 





Copyright Amsco Windows ©