Spring Process

Spring Process
Process:
Overview of process
Definitions:
Any needed definitions
Procedure:
  1. Retrieve the correct paperwork for the next cart being sprung.
    1. If the paperwork is not back on the spring wall, it will be on the Final Paperwork Rack by the blue door leading into the office.
  2. Pull the next mullion pigeonhole cart to the designated cart springing area.
  3. Using the spring paperwork, place the correct springs into their designated pigeonholes.
    1. Slot two springs into each slot that calls for springs.
    2. The springs are listed by size and strength (EX. 26-4 is size 26”, strength 4).
    3. If the spring size called for is missing and a Red Alternative Use flag is in its place, use the substitute spring size called for on the Red Alternative Use flag.
  4. If a new box of springs needs to be opened, open the box by tearing or cutting the front open.
    1. When a new box is opened, remove the piece of cardboard with the label and put it in the designated inventory control box.
  5. After completing the paperwork, verify all slots have a track, filler bars, or springs.
  6. Sign the spring paperwork and place it in the top right pigeonhole.
  7. Transport the now-sprung mullion cart to the mullion cart staging area in prep.
    1. This area only accommodates three carts. Do not fill the mullion cart staging area with more carts.