AMSCO Windows

Final line 1/2 Daily Agenda

Name:                                  Date:

Daily Smart Goal (Specific, Measurable, Achievable, Realistic, Timely):                                        



Area Expectations (Items that need to be done every day)
Check Setup Meet with Supervisor Standup team meeting Plan setup for next shift Old list / Trucks
monitor starts and stops Training with team member Note to Counterpart Shift startup Update production tracking boards
Game of Work Kronos Note Low-e Wand Inventory W/C NDY Report Post Screen and Rack Report

RRC Results (Findings from your RRC inspection):



Flow Stoppers (any instance(s) that interrupted flow):



Daily process audit:
Scrape and Retape Setting in Final Missing STK Catching in Final
NFRCs in Final Low-E Checks in Final Final Rack Report Screens in Final













Copyright Amsco Windows ©